We erected a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took: 3 hours 51minutes 45seconds using tube and fittings.
How long will it take you and how much will you save?
You could save 0 hours and £0*
*Based on an average scaffolder wage
We erected a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took: 2 hours 15 minutes 26 seconds using a Genlok scaffold.
How long will it take you and how much will you save?
You could save 0 hours and £0*
*Based on an average scaffolder wage
The Futuro Challenge has been created to show you how much time and money you could be saving by using Futuro; compared to tube and fitting and other modular system scaffolds. The challenge works out how much money you could be saving on labour costs based on the average scaffolder wage due to the quicker erection time.
At Generation we cannot deny the advantages that Futuro has to offer in the ever-changing world of Scaffolding, so we thought it was only fair to share with you the reasons why we love Futuro.
To erect a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took:
Futuro is manufactured to the highest standards and is compliant with the requirements of the NASC CoP product audit. Speak to our experts about how this can work for you!
Speak to our experts to find out more